Skip to content
Kottinger CapitalKottinger Capital

Focus

The scarce assets behind AI factories.

Four building blocks every AI factory needs — and too few are ready.

Aerial view of fields
01

Land

Sites primed for data center construction, with connectivity within reach.

  • Development-ready
  • Connectivity
  • Scalable footprint
02

Power

Secured, scalable energy from multiple sources.

  • Electric grid
  • Natural gas
  • Solar
  • Hydro
Transmission pylons at dusk
Grid
Gas power plant at night
Natural gas
Solar farm
Solar
Dam releasing water
Hydro
Electrical substation in low sun
Aerial view of water treatment basins
Circular water tanks from above
03

Water

Reliable water rights and supply for cooling at scale, secured before we build.

  • Water rights
  • Cooling supply
  • Reuse
04

Powered shells

Buildings fully activated with power and cooling, ready for high‑performance compute installation.

  • Power live
  • Cooling installed
  • HPC-ready
Empty industrial hall
Rooftop cooling plant and piping from above

Progression

From raw land to AI factory.

  1. 01

    Land

    Secure
  2. 02

    Power

    Energize
  3. 03

    Water

    Supply
  4. 04

    Powered shell

    Activate
  5. 05

    AI factory

    Compute

Build the foundations of
tomorrow's AI factories.

Investor enquiries